He sounds so lovely.
New run is nearly ready. The area in front of the hutch was a downward slope so I dug out all of the slope and levelled the ground. Had 4 sleepers (eco friendly softwood ones) delivered, 3 paving slabs, bag of sand and a tonne of soil. Cut up the sleepers and fitted them double height round the front of the hutch (like a raised border). Then filled area in with the soil. Fixed the 4 ft pens around hutch and run and placed the 3 flags down. Just got to cover the run and wait fro a friend to put a strip of turf in the run and in an area outside it. Good job I took this week off work, eh? LOL
Also just waiting on the new Guinea home; a loglap shed which will be here w/c 4 May. And I've been offered two female guineas for Gordon so things are getting really exciting!
Exhausted of Leeds.:lol: