tulsi
Wise Old Thumper
I have rung and emailed them but no response yet. I have done the cladding kit (big hole and little hole with two semi circles to clamp onto the pipe) but when I get to the mesh the pipe doesnt go through the little hole so ... do I only use one plate (the big hole) and the two clamps (semi circular plates) or what?
I realise that this will sound like double dutch to anyone who hasnt had one of these kits.
I am urgently in need of help as I have cut the mesh and dont have a way of properly blocking off the hole!!!
If anyone has connected a shed (or hutch) to a mesh run PLEASE tell me what to do. Many thanks.
Eta that the shed and run are very close together (a few inches apart) but I have got a four foot pipe as I reakoned that the wabbits would have fun whizzing through it.
Eta the welfare hutch company have rung back and said we can use the big template for outside the mesh run and just the two semi circles for the inside - phew.
I realise that this will sound like double dutch to anyone who hasnt had one of these kits.
I am urgently in need of help as I have cut the mesh and dont have a way of properly blocking off the hole!!!
If anyone has connected a shed (or hutch) to a mesh run PLEASE tell me what to do. Many thanks.
Eta that the shed and run are very close together (a few inches apart) but I have got a four foot pipe as I reakoned that the wabbits would have fun whizzing through it.
Eta the welfare hutch company have rung back and said we can use the big template for outside the mesh run and just the two semi circles for the inside - phew.
Last edited: