keletkezes
Wise Old Thumper
Was going to post this in my long-running thread but though it'd get more attention on its own.
I am insulating a secondhand wendy house with polystyrene covered by plywood. All the polystyrene fits into the space between the frame bits with a bit of a gap between the shiplap and the plywood (about 1/8"-1cm or so) and I'm not sealing the plywood so tight it'll not breathe.
The pictures below show the gap at the eaves of the playhouse: I intended a gap there but maybe not this big! Should I cover it a bit more?
I am insulating a secondhand wendy house with polystyrene covered by plywood. All the polystyrene fits into the space between the frame bits with a bit of a gap between the shiplap and the plywood (about 1/8"-1cm or so) and I'm not sealing the plywood so tight it'll not breathe.
The pictures below show the gap at the eaves of the playhouse: I intended a gap there but maybe not this big! Should I cover it a bit more?